Scrubber Sludge/Bottom Ash Pond

Design Criteria

In accordance with 40 CFR Part 257.71, the Bottom Ash Pond Clay Liner Evaluation is now complete and available in the on-site operating record and this website §257.107(f)(3).

In accordance with 40 CFR Part 257.73(a)(2), the Bottom Ash Periodic Hazard Potential Classification Assessment is now complete and available in the on-site operating record and this website §257.107(f)(4).

In accordance with 40 CFR Part 257.73(c)(1), the Bottom Ash History of Construction is now complete and available in the on-site operating record and this website §257.107(f)(8).

In accordance with 40 CFR Part 257.73(d), the Bottom Ash Structural Stability Assessment is now complete and available in the on-site operating record and this website §257.107(f)(9).

In accordance with 40 CFR Part 257.73(e), the Bottom Ash Safety Factor Assessment is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.73(a)(2), the Bottom Ash Periodic Hazard Potential Classification 5-yr Assessment is now complete and available in the on-site operating record and this website §257.107(f)(4).

In accordance with 40 CFR Part 257.73(d), the Bottom Ash Structural Stability 5-yr Assessment is now complete and available in the on-site operating record and this website §257.107(f)(9).

In accordance with 40 CFR Part 257.73(e), the Bottom Ash Safety Factor 5-yr Assessment is now complete and available in the on-site operating record and this website.

Clay Liner Evaluation
Hazard Potential Classification
History of Construction
Structural Stability Assessment
Safety Factor Assessment
Hazard Potential Classification 5-yr Assessment
Structural Stability 5-yr Assessment
Safety Factor 5-yr Assessment

Location Requirements

Information will be posted as applicable requirements are reached and met.

In accordance with 40 CFR Part 257.60-64, The Bottom Ash Location Restriction Demonstration is now complete and available in the on-site operating record and this website.

2018 BA Location Restriction Demonstration

Operating Criteria

Information will be posted as applicable requirements are reached and met. The Fugitive Dust Control Plan may be accessed from the Facility Wide CCR Documentation link.

In accordance with 40 CFR Part 257.83(b), the 2015 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2016 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.73(a)(3), the 2017 Emergency Action Plan for the Bottom Ash Pond is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2017 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2018 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2019 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2020 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2021 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2022 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.83(b), the 2023 Annual Inspection Report is now complete and available in the on-site operating record and this website.

In accordance with 40 CFR Part 257.82, the Inflow Design Flood Control System Plan is now complete and available in the on-site operating record and this website §257.107(g)(4).

In accordance with 40 CFR Part 257.82, the Inflow Design Flood Control System Plan 5-yr Assessment is now complete and available in the on-site operating record and this website §257.107(g)(4).

In accordance with 40 CFR Part 257.73(a)(3), the 2022 Emergency Action Plan for the Bottom Ash Pond is now complete and available in the on-site operating record and this website.

2015 Annual Inspection Report
2016 Annual Inspection Report
2017 Annual Inspection Report
2018 Annual Inspection Report
2019 Annual Inspection Report
2020 Annual Inspection Report
2021 Annual Inspection Report
2022 Annual Inspection Report
2023 Annual Inspection Report
Inflow Design Flood Control Plan
BA EAP
2022 BA EAP Update
Inflow Design Flood Control System 5-yr Assessment

Groundwater Monitoring

In accordance with 40 CFR Part 257.91(f), Professional Engineer's Certification of Groundwater Monitoring System is now complete and available in the on-site operating record and this website [40 CFR 257.107(h)(2)].

In accordance with 40 CFR Part 257.93(f)(6), Professional Engineer's Certification of Groundwater Monitoring Statistical Method is now complete and available in the on-site operating record and this website [(40 CFR 257.107(h)(3)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2017 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2018 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2019 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2020 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2021 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2022 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

In accordance with 40 CFR 257.105(h)(1) and 40 CFR 257.90(e), the 2023 Annual Groundwater Monitoring and Corrective Action Report is now complete and available in the on-site operating record and the website [40 CFR 257.107(h)(1)].

 Additional information will be posted as applicable requirements are reached and met.

PE Certification of GW Monitoring System Design
PE Certification of Statistical Method
2017 Annual GW Monitoring and CA Report
2018 Annual GW Monitoring and CA Report
2019 Annual GW Monitoring and CA Report
2020 Annual GW Monitoring and CA Report
2021 Annual GW Monitoring and CA Report
2022 Annual GW Monitoring and CA Report
2023 Annual GW Monitoring and CA Report

Closure and Post-Closure

In accordance with 40 CFR Part 257.102 (2), the Bottom Ash Pond Closure Plan is now complete and available in the on-site operating record and this website §257.107(i)(4).

In accordance with 40 CFR Part 257.104, the Bottom Ash Pond Post-Closure Plan is now complete and available in the on-site operating record and this website §257.107(i)(12).

Bottom Ash Closure Plan
Post Closure Plan